DENSE PHASE TRANSPORTER REHABILITATION

Feb 01, 2010

Matrix Engineering restored a 20 year old Dense Phase Transport System back to working order at its original rate capacity.  Ironically, this was one of the first dense phase systems that our engineers worked with during the original installation in 1990. We were pleased to be able to return to this system and make the repairs which primarily consisted of replacement of outdated pneumatic air controls.


The extent of repair was relatively inexpensive, especially when compared the overall efficiency improvement, return to design rate, and the reduction in compressed air consumption.


Matrix physically performed all of the mechanical service and repairs and worked closely with plant personnel to make any electrical changes to the system. This is a prime example of our “hand’s on” nature.

More Projects & News

MATRIX TUGMONITOR is a high end engine monitoring and alarm system that is simple to add alarms to.
26 Jan, 2024
Matrix provides a PLC based TUGMONITOR for a 6000HP TWIN ENGINE NEW BUILD. Communicates seamlessly via ethernet with GE Engines.
LUMP DISSOLVE FEEDER
01 Dec, 2021
Matrix provided conceptual and hard mechanical design of a heavy duty screw feeder for metering phosphorus pentoxide (crystallized phosphoric acid) into a dissolve tank. Due to the hot reaction during hydration in the tank (resulting into very hot phosphoric acid) the variable speed screw feeder consisted of a 316L S/S 12 inch diameter auger and 1/2 inch thick trough. A special dump hopper with automated closing lid was designed with a large grated opening and bypass chute at the inlet of the feeder. Very special design considerations were made for protecting the conveyor seals and bearings from making contact with the hot acid. Our design allowed the acid crystals or hot liquid to fall out into an isolated gap and into the tank before it challenged the seal. This was a highly successful design has virtually eliminated the huge stock piles of drummed feedback material that accumulated due to the inability to dissolve the crystallized acid safely.
By Darren Jarvis 03 Jan, 2021
Matrix Industrial Systems was proud to work in conjunction with AC Marine in designing and supplying critical systems for Georgia Aquarium's newest venue to experience sharks directly with the grand opening of their 1.2MM gallon Shark Tank. This attraction allows you to submerge into the tank within a shark cage and begin an underwater journey traversing the pool as it is suspended and moved by a hoist/monorail system. Breathing air for the participants is supplied through an umbilical tethered to the cage and connected to a specialized Breathing Air Control System (BACS). Matrix supplied and installed this system with its umbilical as a turnkey project. Matrix and AC Marine were proud to be guinea pigs (or should I say SHARK BAIT) on the maiden voyage!
Show More
Share by: